• image
  • image
  • image
  • image
  • image

PROJECT DESCRIPTION

A complete renovation upgraded all of the existing public spaces, locker rooms, and lobby. The original 185’ long rink and ice generation equipment was replaced with a new 200’ long rink and more efficient ice generation system. A new addition was added to provide a connection concourse outside of the original building footprint. A low-e reflective film was added to the ceiling to improve the ice system performance, ice quality, and lighting in the building. Finish, lighting, accessibility, and safety upgrades rounded out the project.

PROJECT DETAIL

  • Location: Fargo, ND